Search results for: 2016 03 0279

Cod Eur Lex Europa Eu

Procedure 2016/0279/COD. COM (2016) 595: Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL on the cross-border exchange between the Union and third countries of accessible format copies of certain works … 23/03/2017 : Discussions within the Council or its preparatory bo.s.

Nvd Cve

Description. JBoss RichFaces before 4.5.4 allows remoteers to inject expression language (EL) expressions and execute arbitrary Java code via the do parameter. Source: MITRE Last Modified: 03/26/2015. Quick Info. CVE Dictionary Entry: CVE-2015-0279; Original release date: 03/26/2015; Last revised: 08/23/2016 …

Nvd Cve

May 12, 2017 – Current Description. The Microsoft Server Message Block 1.0 (SMBv1) server on Microsoft Windows Server 2008 SP2 and R2 SP1, Windows 7 SP1, Windows 8.1, Windows Server 2012 Gold and R2, Windows RT 8.1, Windows 10 Gold, 1511, 1607, and 1703, and Windows Server 2016 allows aner …

Physical Stress And Biological Control Regulate The

May 1, 2004 – Abstract. Epilithic biofilms play a key role in marine ecosystems. They also provide a tractable system to investigate the relative roles of environmental stressors, bottom-up physicochemical factors and top-down biological control in regulating communities. Patterns of photosynthetic microbial biomass were …

Quantification Of Meta Model And Parameter Uncertainties In Robust

2016-01-0279. Published: 2016-04-05. DOI: https://doi.org/10.4271/2016-01-0279. Citation: Chen, C., Zhan, Z., Li, J., Jiang, Y. et al., "Quantification of Meta-model and Parameter Uncertainties in Robust Design," SAE Technical Paper 2016-01-0279, 2016, https://doi.org/10.4271/2016-01-0279. Download Citation. Author(s):.

Pdfnumber Liteform

Valid Through: 05/2016. Page 1 of 22. EVALUATION SUBJECT: Helix 5-25 Micro-Rebar Concrete Reinforcement. System. REPORT HOLDER: Polytorx, LLC d.b.a. Helix Steel. 300 N 5th Ave Suite 130. Ann Arbor, MI 48104. 734-322-2114 www.helixsteel.com info@helixsteel.com. CSI Division: 03 00 00—CONCRETE.

Txdot

Oct 16, 2017 – Totals for 0279-02-045. Length: 0. Estimate: $90,000. Actual: $136,161. CCSJ: 027903-035. District: PARIS, Let Date: Oct 2016. Highway: SH 78, Let Status: Actual. Project ID: STP 2017(188)HES, CSJ: 027903-035. Description: SAFETY TREAT FIXED OBJECTS, Handling Code: Limits From: SH 11, Fund …